Extra-Work Catcher

Finds the work your crews did that isn't in the contract, and drafts the change order before it's forgotten.

$7,862

found in one sample week

Built for

  • Project managers
  • Owners / GMs
  • Project controls
  • Superintendents

Live example

adg/extra-work-catcher · ready

Scenario · A mechanical contractor is on a lump-sum piping tie-in scope. It's Friday, and the agent reviews the week's paperwork.

01This week's paperwork vs. contract

Subcontract scope: Piping Tie-ins, Area 3

Document

Lump sum · Rate sheet Rev 3 applies to changes

  • 3.1 Install CW tie-ins per P&ID 3-CW-104 routing
  • 3.4 Isolation valves: 4 × 4" as shown
  • 5.2 Standby due to delays by others billable at crew rates

DAILY FIELD TICKET No. 7741–7745

Mon–Fri · Area 3 · 5 tickets

  • Tue: waited on hot work permit 3.5 hrs, crew of 3
  • Wed: reroute CW line around new cable tray (by elec.)
  • Thu: client rep asked for 2 extra isol. valves
  • Thu: re-hydro spool 3 after leak at flange

Foreman: K. Dumont

photo · IMG_0412

02Agent run

  1. Loading contract baseline
  2. Reading the week
  3. Comparing to scope
  4. Pricing + drafting

03Found-money report + CO draft

Output appears here

The problem

On every job, crews do things that aren't in the original scope: rerouting around another trade, waiting on a permit, adding what the client rep asked for on the walkdown. It shows up on a field ticket or in a photo and then vanishes, because nobody compared it back to the contract. The Extra-Work Catcher reads every ticket, daily log, RFI, and photo against the contracted scope. It flags anything that looks billable, prices it with your rate sheet, and drafts the change order or T&M claim with the evidence attached.

Today

  • Extra work done on a handshake and never billed
  • Standby time absorbed because nobody logged the cause
  • Change orders written weeks later, with no evidence
  • Margin leaks discovered at job close, too late to recover

With the agent

  • Every ticket compared against the contracted scope automatically
  • Potential extras flagged within a day, while memories are fresh
  • Change orders drafted with ticket, photo, and email evidence attached
  • Weekly found-money report per job

How it works

4 steps, with you in control.

  1. 01

    Baseline

    Reads the contract, scope of work, drawings list, and rate sheet to understand what's included.

  2. 02

    Watch

    Reads every field ticket, daily log, RFI, and site photo as it comes in.

  3. 03

    Compare

    Flags work outside scope, delays caused by others, and client-directed changes, and separates them from your own rework.

  4. 04

    Claim

    Prices each item from the rate sheet and drafts the change order or T&M claim with evidence, ready for the PM to send.

Comes in

Contract + scope of work
Field tickets & daily logs
RFIs, emails, photos

Agent does

Compare to scope
Separate rework from extras
Price + draft CO

You check

PM decides what to claim

Goes out

Change order drafts
T&M claims
Weekly found-money report

Works with

  • Field Ticket → Invoice
  • Outlook
  • SharePoint
  • Excel / Sage job costing

Nothing leaves without a person approving it. Agents draft, check, and flag. Your team makes the call. Data stays in your Microsoft 365 or Google tenant wherever possible.

What it's worth

Run your own numbers.

Slide to match your team. Defaults are typical for a small-to-mid contractor in the region.

4 hrs
$90/hr
70%

Hours back per year

134

Estimated annual value

$12,100

Estimate only, based on 48 working weeks. We confirm real numbers in a free workflow audit.

Want Extra-Work Catcher running on your jobs?

Book a free 45-minute workflow audit. We'll map where your office and field hours go and show you which agent pays for itself first.